Strategic Pipeline Alliance

Cathodic Protection Co.Ltd are proud to be a part of the Anglian Water ๐—ฆ๐˜๐—ฟ๐—ฎ๐˜๐—ฒ๐—ด๐—ถ๐—ฐ ๐—ฃ๐—ถ๐—ฝ๐—ฒ๐—น๐—ถ๐—ป๐—ฒ ๐—”๐—น๐—น๐—ถ๐—ฎ๐—ป๐—ฐ๐—ฒ (๐—ฆ๐—ฃ๐—”) after securing the opportunity to work with them.

The SPA has been conducting work in the driest region of the UK since 2021, laying down new water pipelines over hundreds of kilometres from ๐—ก๐—ผ๐—ฟ๐˜๐—ต ๐—Ÿ๐—ถ๐—ป๐—ฐ๐—ผ๐—น๐—ป๐˜€๐—ต๐—ถ๐—ฟ๐—ฒ ๐˜๐—ผ ๐—˜๐˜€๐˜€๐—ฒ๐˜…. The project, which is due to be finished in 2025, is aiming to take ๐Ÿฎ๐Ÿฒ๐Ÿฑ ๐—บ๐—ถ๐—น๐—น๐—ถ๐—ผ๐—ป ๐—น๐—ถ๐˜๐—ฟ๐—ฒ๐˜€ of water from the wettest areas in the North of the region, to the driest areas in the East and South. A 34km pipeline section has already been installed from Lincoln to Grantham.

CPCL are excited to be providing full cathodic protection along the pipelines steel sections, ensuring the longevity and durability of the infrastructure. We are delighted to be part of an initiative which will ๐—ฎ๐—น๐—น๐—ฒ๐˜ƒ๐—ถ๐—ฎ๐˜๐—ฒ ๐˜„๐—ฎ๐˜๐—ฒ๐—ฟ ๐˜€๐—ต๐—ผ๐—ฟ๐˜๐—ฎ๐—ด๐—ฒ๐˜€ and ๐—ฒ๐—ป๐—ต๐—ฎ๐—ป๐—ฐ๐—ฒ ๐—ฟ๐—ฒ๐˜€๐—ถ๐—น๐—ถ๐—ฒ๐—ป๐—ฐ๐—ฒ ๐—ฎ๐—ด๐—ฎ๐—ถ๐—ป๐˜€๐˜ ๐—ฑ๐—ฟ๐—ผ๐˜‚๐—ด๐—ต๐˜, which is crucial for maintaining essential water supply for communities, agriculture and economic growth.

 

Strategic Pipeline Allinace

Map of where the new pipeline will be laid from North Lincolnshire to Essex.