Marine Projects

Dunkerque, France

Dunkirk-LNG

Representing a €1.3 billion investment, the Dunkerque LNG Plant is the second largest industrial construction site in France.  Due to open by the end of 2016, it is being developed by EDF, Fluxys and TOTAL and will have a production capacity of 1.3 billion cubic metres per annum.

In an ongoing contract, CPCL was commissioned to design and supply the materials for galvanic anode cathodic protection for a jetty and pumps.

 

GATE, Netherlands

EconGas-Gate-LNG-Terminal-Opens  The-Netherlands-Gate-LNG-Flow-Rate-Hits-Million-m3h

The GATE (Gas Access to Europe) LNG terminal, located in Maasvlakte in Rotterdam, Netherlands, was completed in 2011 and had an initial annual capacity of 12 billion cubic metres.

CPCL was commissioned to design, supply and commissioning of Sacrificial and Impressed Current cathodic protection system for the LNG jetty.